Phantom+LUTs+Logo.jpg
Phantom LUTs for DJI Ronin 4D 6K 8K D-Log

For Ronin 4D and Inspire 3 users who need to colour match with an ARRI Alexa, want more creative choices for their post workflow, or who are unsatisfied with the standard DJI Technical 709 LUTs on offer, I have developed a LUT that accurately emulates the ARRI Alexa 709 colour science for D-LOG on the Zenmuse X9-6K & X9-8K camera.

Along with the emulation LUT, there are 4 creative variation LUTs that come with it packaged as an ARRI LUT 5 Pack.

For the nostalgic among you, I have also developed 6 Film Emulation LUTs that each emulate film stocks from the past.

All LUTs include 33x and 65x versions

These LUTs are very easy to use and will help your LOG footage reach the most pleasing starting point for grading, saving you time and effort.

Phantom LUTs are Rec.709 finishing LUTs designed to take your camera’s native Log footage into the Rec.709 colour space, delivering a finished look that emulates the Alexa709 LUT.

Camera Compatibility:
Ronin 4D 6K, 4D 8K, Inspire 3

‘ARRI Look’ 5 Pack - $49 USD

‘Film Look’ 6 Pack - $49 USD

All 11 In One Bundle (Most Popular) - $79 USD


A lot of ARRI Alexa users have been utilising 4Ds as B or C cams due to their great image and incredible features and need a LUT to colour match the 2 camera systems. As well as this, a lot of 4D users have emailed me describing their dissatisfaction with the native colours coming out of their camera. To address these issues, I decided to develop a LUT to emulate my Alexa mini using the tried and true process I developed with Sony, Canon, DJI and Blackmagic cameras. While no camera is perfect, personally I find the Alexa’s colour science to be the gold standard in terms natural, accurate and beautiful colours right out of the box as a starting point to grade from.

Over the course of a few days, I shot exposure matched test footage with my Alexa Mini and 4D side by side. I shot in sunlight, shadow, overcast, indoor daylight, indoor mixed lighting, controlled studio lighting and all with my trusty Xrite Colour Checker Classic Card and my Xrite Digital Color Checker SG Card.

In total I shot approximately 80 scenes this way. With each set up I recorded 3 exposures - under 2 stops over 2 stops and correct exposure. With the extensive data gathered, I was able to build an emulation that is extremely accurate; factoring in not just the overall colour response but also the more subtle aspects of the Alexa colour science that it borrowed from photochemical film such as it’s non linear hue responses for rich, complex colours, subtractive colour modelling in relation to luminance vs saturation dynamics and the Alexa’s overall saturation profile for beautiful highlight rolloff and shadow falloff to name a few.

Two graphs comparing gamma curves for different input and output configurations with a focus on LUT in and out settings. Each graph has a similar S-curve, grid background, and annotations detailing percentage and 10-bit values.

The 4D Neutral LUT gamma curve matches the Alexa LogC to Rec709 LUT perfectly.

The ARRI 5-Pack

Along with the emulation LUT, there are 4 creative variation LUTs that come with it packaged as the ARRI LUT 5 Pack.

The 5 ARRI LUTs Described Below:

The FILM 6-Pack

For the nostalgic among you, I have developed 6 Film Emulation LUTs that each emulate film stocks from the past.

The ‘Film Look’ LUT Pack contains 6 LUTs inspired by real film stocks designed to give your D-Log Footage the Film Look. The emulations are based on my own research and subjective impressions of the film stocks listed.

The 6 FILM LUTs Described Below:

What’s in the box?

  • 65x High-Resolution editing LUTs (6K & 8K Versions)

  • 33x Monitoring LUTs (for use monitoring or in-camera)

  • Legacy Variations on each LUT (features Sony’s older gamma curve)

  • White Balance Offset (Green and Warmth Boost for 6K)

  • Wide Dynamic Range Pre-LUT

  • Detailed ReadMe PDF with recommended settings

The images below are taken from video projects that were colour graded with Phantom LUTs.

The 'ARRI Looks'

Phantom LUTs for DJI Ronin 4D 6K, 4D 8K & Inspire 3

The 'Film Looks'

Color Grading with Phantom LUTs


What Exactly Are LUTs?

A LUT (Look-Up Table) is a file containing a predefined set of mathematical instructions to transform colors in an image or video. In filmmaking, LUTs are essential for converting flat, low-contrast log footage into a rich, cinematic image. They are the fastest and most consistent way to achieve a professional color grade, but their quality is determined by the precision of their creation.

Collage of cinematic scenes with a natural, filmic look, color graded with Phantom LUTs. Images feature warm, natural skin tones in golden hour and soft indoor lighting to enhance emotional storytelling.
Montage of cinematic video stills showing the warm, filmic color grading of Phantom LUTs on scenes with natural skin tones and a desert landscape.
Collage of diverse cinematic scenes demonstrating the versatile color grading of Phantom LUTs for drama, documentaries, and commercial video projects.